Managing Contaminated Groundwater

Contaminated groundwater sites represent a significant liability for DoD and require characterization, remediation, and monitoring. SERDP and ESTCP efforts are leading to improved cleanup practices and reduced life-cycle costs.

Active Projects List
Project Title Start Date

Coupled Diffusion and Reaction Processes in Rock Matrices: Impact on Dilute Groundwater Plumes

Project Information
Project ID: ER-1685
Principal Investigator: Dr. Charles Schaefer, Shaw Environmental, Inc.
SERDP Jan 2009

DNAPL Removal from Fractured Rock Using Thermal Conductive Heating

Project Information
Project ID: ER-200715
Principal Investigator: Ms. Carmen Lebr�n, Naval Facilities Engineering Command Engineering Service Center
ESTCP Apr 2007

Decision Support System for Matrix Diffusion Modeling

Project Information
Project ID: ER-201126
Principal Investigator: Dr. Charles Newell, GSI Environmental Inc.
ESTCP Mar 2011

Demonstration and Validation of a Fractured Rock Passive Flux Meter

Project Information
Project ID: ER-200831
Principal Investigator: Dr. Kirk Hatfield, University of Florida
ESTCP Apr 2008

Demonstration and Validation of a Portable Raman Sensor for In Situ Detection and Monitoring of Perchlorate (ClO4-)

Project Information
Project ID: ER-201327
Principal Investigator: Dr. Baohua Gu, Oak Ridge National Laboratory (ORNL)
ESTCP Jan 2013

Demonstration of a Fractured Rock Geophysical Toolbox for Characterization and Monitoring of DNAPL Biodegradation in Fractured Rock Aquifers

Project Information
Project ID: ER-201118
Principal Investigator: Dr. Lee Slater, Rutgers University-Newark
ESTCP Mar 2011

Demonstration of a Full-Scale Fluidized Bed Bioreactor for the Treatment of Perchlorate at Low Concentrations in Groundwater

Project Information
Project ID: ER-200543
Principal Investigator: Dr. Todd Webster, Envirogen Technologies Inc.
ESTCP Mar 2006

Demonstration of a New, Highly Perchlorate-Selective Ion Exchange Resin Coupled with Resin-Optimized, Single-Vessel Engineering Design

Project Information
Project ID: ER-200542
Principal Investigator: Jim Summerfield, Dow Water and Process Solutions
ESTCP Oct 2005

Demonstration of an In-Situ Friction-Sound Probe for Mapping Particle Size at Contaminated Sediment Sites

Project Information
Project ID: ER-200919
Principal Investigator: Dr. D. Bart Chadwick, SPAWAR
ESTCP Jan 2009

Demonstration of the Gore Module for Passive Groundwater Sampling

Project Information
Project ID: ER-200921
Principal Investigator: Ms. Louise Parker, U.S. Army Engineer Research and Development Center (ERDC)
ESTCP Jan 2009

Demonstration/Validation of More Cost-Effective Methods for Mitigating Radon and VOC Subsurface Vapor Intrusion to Indoor Air

Project Information
Project ID: ER-201322
Principal Investigator: Mr. Todd McAlary, Geosyntec Consultants, Inc.
ESTCP Jan 2013

Designing, Assessing, and Demonstrating Sustainable Bioaugmentation for Treatment of DNAPL Sources in Fractured Bedrock

Project Information
Project ID: ER-201210
Principal Investigator: Dr. Charles Schaefer, Shaw Environmental, Inc.
ESTCP Mar 2012

Determining Source Attenuation History to Support Closure by Natural Attenuation

Project Information
Project ID: ER-201032
Principal Investigator: Dr. Charles Newell, GSI Environmental Inc.
ESTCP Nov 2009

Developing and Field-Testing Genetic Catabolic Probes for Monitored Natural Attenuation of 1,4-Dioxane with a One-Year Timeframe

Project Information
Project ID: ER-2301
Principal Investigator: Dr. Pedro Alvarez, Rice University
SERDP Jan 2013

Development and Validation of a Quantitative Framework and Management Expectation Tool for the Selection of Bioremediation Approaches at Chlorinated Solvent Sites

Project Information
Project ID: ER-201129
Principal Investigator: Ms. Carmen Lebr�n, Naval Facilities Engineering Command Engineering Service Center
ESTCP Mar 2011

Development of Biomarkers for Assessing In Situ RDX Biodegradation Potential

Project Information
Project ID: ER-1606
Principal Investigator: Dr. Alison Cupples, Michigan State University
SERDP Jan 2008

Development of More Cost-Effective Methods for Long-Term Monitoring of Soil Vapor Intrusion to Indoor Air Using Quantitative Passive Diffusive-Adsorptive Sampling Techniques

Project Information
Project ID: ER-200830
Principal Investigator: Mr. Todd McAlary, Geosyntec Consultants, Inc.
ESTCP Apr 2008

Development of a Passive Flux Meter Approach to Quantifying 1,4-Dioxane Mass Flux

Project Information
Project ID: ER-2304
Principal Investigator: Dr. Michael Annable, University of Florida
SERDP Jan 2013

Development of an Expanded, High-Reliability Cost and Performance Database for In Situ Remediation Technologies

Project Information
Project ID: ER-201120
Principal Investigator: Mr. Travis McGuire, Groundwater Services, Inc.
ESTCP Mar 2011

Development of an Integrated Field Test/Modeling Protocol for Efficient In Situ Bioremediation Design and Performance Uncertainty Assessment

Project Information
Project ID: ER-2311
Principal Investigator: Dr. Linda Abriola, Tufts University
SERDP Jan 2013

Symposium & Workshop

NEW! National Academy of Sciences Report:
Alternatives for Managing the Nation's Complex Contaminated Groundwater Sites (2012)
 
Workshop Report:
Investment Strategies to Optimize Research and Demonstration Impacts in Support of DoD Restoration Goals (2011)
 
Defense Environmental Restoration Program