Managing Contaminated Groundwater

Contaminated groundwater sites represent a significant liability for DoD and require characterization, remediation, and monitoring. SERDP and ESTCP efforts are leading to improved cleanup practices and reduced life-cycle costs.

Active Projects List
Project Title Start Date

Use of On-Site GC/MS Analysis to Distinguish between Vapor Intrusion and Indoor Sources of VOCs

Project Information
Project ID: ER-201119
Principal Investigator: Dr. Thomas McHugh, GSI Environmental Inc.
ESTCP Mar 2011

Use Of Mass-Flux Measurement and Vapor-Phase Tomography to Quantify Vadose-Zone Source Strength and Distribution

Project Information
Project ID: ER-201125
Principal Investigator: Dr. Mark Brusseau, University of Arizona
ESTCP Jan 2011

Generation of Biodegradation-Sorption Barriers for Munitions Constituents

Project Information
Project ID: ER-201123
Principal Investigator: Dr. Robert Borden P.E., North Carolina State University
ESTCP Mar 2011

Methods for Minimization and Management of Variability in Long-Term Groundwater Monitoring Results

Project Information
Project ID: ER-201209
Principal Investigator: Dr. Thomas McHugh, GSI Environmental Inc.
ESTCP Mar 2012

Field Demonstration, Optimization, and Rigorous Validation of Peroxygen-Based ISCO for the Remediation of Contaminated Groundwater

Project Information
Project ID: ER-200632
Principal Investigator: Dr. Richard Watts, Washington State University
ESTCP Apr 2006

Assessment of the Natural Attenuation of NAPL Source Zones and Post-Treatment NAPL Source Zone Residuals

Project Information
Project ID: ER-200705
Principal Investigator: Dr. Paul Johnson, Arizona State University
ESTCP Apr 2007

DNAPL Removal from Fractured Rock Using Thermal Conductive Heating

Project Information
Project ID: ER-200715
Principal Investigator: Ms. Carmen Lebr�n, Naval Facilities Engineering Command Engineering Service Center
ESTCP Apr 2007

Improving Effectiveness of Bioremediation at DNAPL Source Zone Sites Applying Partitioning Electron Donors

Project Information
Project ID: ER-200716
Principal Investigator: Ms. Carmen Lebr�n, Naval Facilities Engineering Command Engineering Service Center
ESTCP Apr 2007

Combining Low-Energy Electrical Resistance Heating with Biotic and Abiotic Reactions for Treatment of Chlorinated Solvent DNAPL Source Areas

Project Information
Project ID: ER-200719
Principal Investigator: Dr. Tamzen Macbeth, CDM
ESTCP Apr 2007

Demonstration and Validation of a Fractured Rock Passive Flux Meter

Project Information
Project ID: ER-200831
Principal Investigator: Dr. Kirk Hatfield, University of Florida
ESTCP Apr 2008

Cooperative Technology Demonstration: Polymer-Enhanced Subsurface Delivery and Distribution of Permanganate

Project Information
Project ID: ER-200912
Principal Investigator: Dr. Michelle Crimi, Clarkson University
ESTCP Apr 2009

Enhanced Amendment Delivery to Low Permeability Zones for Chlorinated Solvent Source Area Bioremediation

Project Information
Project ID: ER-200913
Principal Investigator: Dr. Charles Newell, GSI Environmental Inc.
ESTCP Jan 2009

Incorporating Aerobic Processes into Remedies for Large Chlorinated Solvent Plumes

Project Information
Project ID: ER-201026
Principal Investigator: Dr. Brian Looney, Savannah River National Laboratory (SRNL)
ESTCP Nov 2009

Use of Enzyme Probes for Estimation of Trichloroethene Degradation Rates and Acceptance of Monitored Natural Attenuation

Project Information
Project ID: ER-200708
Principal Investigator: Dr. M. Hope Lee, Idaho National Laboratory
ESTCP Apr 2007

Optimized Enhanced Bioremediation Through Four-Dimensional Geophysical Monitoring and Autonomous Data Collection, Processing, and Analysis

Project Information
Project ID: ER-200717
Principal Investigator: Mr. Bill Major, NFESC
ESTCP Apr 2007

Parallel In Situ Screening of Remediation Strategies for Improved Decision Making, Remedial Design, and Cost Savings

Project Information
Project ID: ER-200914
Principal Investigator: Dr. Rolf Halden, Arizona State University
ESTCP Jan 2009

Demonstration of the Gore Module for Passive Groundwater Sampling

Project Information
Project ID: ER-200921
Principal Investigator: Ms. Louise Parker, U.S. Army Engineer Research and Development Center (ERDC)
ESTCP Jan 2009

Direct-Push Optical Screening Tool for High-Resolution, Real-Time Mapping of Chlorinated Solvent DNAPL Architecture

Project Information
Project ID: ER-201121
Principal Investigator: Mr. Murray Einarson, Hayley and Aldrich
ESTCP Mar 2011

Cost-Effective, Ultra-Sensitive Groundwater Monitoring for Site Remediation and Management

Project Information
Project ID: ER-201122
Principal Investigator: Dr. Rolf Halden, Arizona State University
ESTCP Mar 2011

Quantifying Life-Cycle Environmental Footprints of Soil and Groundwater Remedies

Project Information
Project ID: ER-201127
Principal Investigator: Ms. Karla Harre, Naval Facilities Engineering Command Engineering Service Center
ESTCP Mar 2011

Symposium & Workshop

NEW! National Academy of Sciences Report:
Alternatives for Managing the Nation's Complex Contaminated Groundwater Sites (2012)
 
Workshop Report:
Investment Strategies to Optimize Research and Demonstration Impacts in Support of DoD Restoration Goals (2011)
 
Defense Environmental Restoration Program